Construction of 42-inch Oil pipeline between West Karoun pump station and Omidieh mixed pump station

20″ Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers using pc method

View Project »

20″Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers

20″ Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers using pc method

View Project »

Fereydunkenar and constructing Oujak sar-Laying water transmission pipeline from Babolsar

Completing water Transmission Pipeline from Babolsar water storage Tank to constructing Fereydunkenar and  Oujak sar. Constructing an Emergency pressure relief manhole at  21+400km from alborz dam

View Project »

Laying pipeline for transmission of surplus water of Babol- water storage tank to Amir kola

Completing Pipeline for transmission of water from babol 25000-m water storage tank to amir kola and water supply and Return Pipeline from and to babol 20000-m water storage

View Project »

Project: Dizbad-Torbat Heydariyeh 30-inch Regulating/Booster Gas Transmission Pipeline

Torbat Heydariyeh County,Khorasan Razavi Province-The project was aimed at regulating gas pressure of as well as supplying gas for Torbat Heydariyeh Steel Mill.

View Project »

Procurement and Construction of Industrial Units Gas Supply

This project is designed and carried out for the purpose of creating a gas supply and distribution network for industrial units and bitumen refineries at Persian Gulf Industrial Park, Bandarabbas…

View Project »

Gurdim Shrimp Farming Complex Construction

Bakhtar Petrochemical Group has dedicated IRR 800,000,000.00 to construction of Gurdim Shrimp Farming Complex in Konarak County, Sistan and Baluchestan Province, with annual production of 4,500 MT. This shrimp farming…

View Project »

Karam Abad drainage and irrigation project

This project involved the design and construction of the main and semi-main polyethylene pipelines with diameters ranging from 50 to 450 mm and equipped with irrigation laterals and wings as…

View Project »

Irrigation water transmission pipeline construction for Sistan Plain

The continuous water scarcity in the region and the need to develop a proper plan to pursue the concerns expressed by the Iranian Supreme Leader and address the problems faced…

View Project »

Imam Ali Expressway-West Janbazan Street Interchange

The Metropolis of Tehran has long been faced with different traffic problems. One of Tehran’s traffic knots can be found in Municipal District 8, along the east-west axis of Janbazan…

View Project »

Wastewater transmission pipeline for 22 Municipal Districts

The project was in line with the objectives specified by Tehran Wastewater Company. It was aimed at enhancing public hygiene and general health in Tehran and managing urban wastewater by…

View Project »

Esfarayen-Neqab-Joghatai gas expansion pipeline

Esfarayen-Neqab-Joghatai 20- and 30- inch gas expansion pipeline was aimed at delivering the required gas to Sabzevar Steel Plant, expanding the branched pipeline of Esfarayen, promoting residents’ welfare and well-being,…

View Project »