Maku gas transmission pipeline and TBS construction project

Contract Date:

2002

عنوان مقدار
ClientNational Iranian Gas Company
AdvisorWest Azarbaijan Province Gas Company
Contract Period270 days
LocationMaku - Showt
StatusFinished

Description

Transmission pipelines and branch valve, dead-end valve, and CPS facilities were used to supply gas to the cities of Maku and Showt. The transmission pipelines were branched from the 40-inch Tabriz-Bazargan gas transmission pipeline. All the operations were carried out by Iran Ertebat Engineering Company. Now, Maku and Showt residents can also benefit from natural gas as a God-given endowment.

Scope of Work

  • Locating, surveying, nailing, and ROW clearing operations
  • Supplying coated pipes along with the required accessories
  • Excavation and trenching operations
  • Welding and bending steel pipes, valves, and steel fittings and constructing and implementing the cathodic protection system
  • Transportation, stringing, and welding operations
  • Construction and mechanical operations of TBS stations
  • Gas injection and commissioning

Key Statistics

  • Excavation and ROW clearing, 500,000 m3
  • ROW clearing, 16,000 m
  • Trenching, 16,000 m
  • Stringing and welding, 16,000 m
  • Hydrostatic testing, 16,000 m
  • Gas injection and commissioning, 16,000 m