Description
Transmission pipelines and branch valve, dead-end valve, and CPS facilities were used to supply gas to the cities of Maku and Showt. The transmission pipelines were branched from the 40-inch Tabriz-Bazargan gas transmission pipeline. All the operations were carried out by Iran Ertebat Engineering Company. Now, Maku and Showt residents can also benefit from natural gas as a God-given endowment.
Scope of Work
- Locating, surveying, nailing, and ROW clearing operations
- Supplying coated pipes along with the required accessories
- Excavation and trenching operations
- Welding and bending steel pipes, valves, and steel fittings and constructing and implementing the cathodic protection system
- Transportation, stringing, and welding operations
- Construction and mechanical operations of TBS stations
- Gas injection and commissioning
Key Statistics
- Excavation and ROW clearing, 500,000 m3
- ROW clearing, 16,000 m
- Trenching, 16,000 m
- Stringing and welding, 16,000 m
- Hydrostatic testing, 16,000 m
- Gas injection and commissioning, 16,000 m