Timeline
Iran Ertebat Engineering Company
Timeline
Iran Ertebat Engineering Company executed its first project in 1993 and after 40 years of experience has managed to gain a competitive advantage over its competitors.
This timeline is a selection of our projects over the past 40 years
Construction of 42-inch Oil pipeline between West Karoun pump station and Omidieh mixed pump station
20″ Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers using pc method
20″Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers
20″ Gas pipeline construction project between Behbahan/Gachsaran with approximate length of 62 kilometers using pc method
Fereydunkenar and constructing Oujak sar-Laying water transmission pipeline from Babolsar
Completing water Transmission Pipeline from Babolsar water storage Tank to constructing Fereydunkenar and Oujak sar. Constructing an Emergency pressure relief manhole at 21+400km from alborz dam
Laying pipeline for transmission of surplus water of Babol- water storage tank to Amir kola
Completing Pipeline for transmission of water from babol 25000-m water storage tank to amir kola and water supply and Return Pipeline from and to babol 20000-m water storage
Project: Dizbad-Torbat Heydariyeh 30-inch Regulating/Booster Gas Transmission Pipeline
Torbat Heydariyeh County,Khorasan Razavi Province-The project was aimed at regulating gas pressure of as well as supplying gas for Torbat Heydariyeh Steel Mill.
Procurement and Construction of Industrial Units Gas Supply
This project is designed and carried out for the purpose of creating a gas supply and distribution network for industrial units and bitumen refineries at Persian Gulf Industrial Park, Bandarabbas County, Hormozagan Province, and is financed by Hormozgan Province Industrial Parks Company.
Gurdim Shrimp Farming Complex Construction
Bakhtar Petrochemical Group has dedicated IRR 800,000,000.00 to construction of Gurdim Shrimp Farming Complex in Konarak County, Sistan and Baluchestan Province, with annual production of 4,500 MT. This shrimp farming complex is the second one in Sistan and Baluchestan Province which is meant to develop fishery in the province and subsequently result in local economic…
Karam Abad drainage and irrigation project
This project involved the design and construction of the main and semi-main polyethylene pipelines with diameters ranging from 50 to 450 mm and equipped with irrigation laterals and wings as well as the classic fixed sprinkler irrigation system, center-pivot irrigation system, manifold irrigation system, lateral irrigation system, and drip irrigation system. The project was implemented…
Irrigation water transmission pipeline construction for Sistan Plain
The continuous water scarcity in the region and the need to develop a proper plan to pursue the concerns expressed by the Iranian Supreme Leader and address the problems faced by the residents, the Iranian Ministry of Agriculture set out to carry out this project. To this end, the water supply resources needed for irrigation…
Imam Ali Expressway-West Janbazan Street Interchange
The Metropolis of Tehran has long been faced with different traffic problems. One of Tehran’s traffic knots can be found in Municipal District 8, along the east-west axis of Janbazan Street just after Imam Ali Expressway. This traffic knot led to a heavy traffic congestion in the point where Imam Ali Expressway exits into Janbazan…
Wastewater transmission pipeline for 22 Municipal Districts
The project was in line with the objectives specified by Tehran Wastewater Company. It was aimed at enhancing public hygiene and general health in Tehran and managing urban wastewater by performing pipe laying operations (1200 and 1400 inch in diameter, 3 km), and constructing 20 manholes in the 22 municipal districts of Tehran (sadr Hughway,…
Esfarayen-Neqab-Joghatai gas expansion pipeline
Esfarayen-Neqab-Joghatai 20- and 30- inch gas expansion pipeline was aimed at delivering the required gas to Sabzevar Steel Plant, expanding the branched pipeline of Esfarayen, promoting residents’ welfare and well-being, and create jobs in the region. The operations were constructed in an area starting from 547th km on North-Northeast 48-inch gas transmission pipeline (Parchin to…
Khajeh Varzaqan Highway – Block 3 Construction
The third block (2B) of Khajeh Varzaqan 4-Lane Highway (from 760+29th to 760+37th km) with a length of 8 km is located in West Azarbaijan Province. It was aimed at promoting residents welfare and well-being and facilitating their commuting trips from the city of Tabriz to Sungun Copper project site. At the time when Sungun…
Tolout-Fereydunkenar Water transmission pipeline
The project was aimed at supplying healthy and safe drinking water (1500 Liter/s) to Mazandaran Province, especially the cities of Babol, Babolsar, Amirkola, Fereydunkenar, and Kalleh Bast, and the villages located along the pipeline route. The project consists of a water treatment facility, water transmission pipelines, reservoir water transmission pipelines, and pumping stations. Tolout-Fereydunkenar water…
Surface water management (Bani Hashem Street)
In recent years,the increasing urban population growth in the Metropolis of Tehran has contributed to the increased utilization of water resources and consequently a reduction in the volume and quality of the water stored at urban reservoirs and the surrounding watersheds….
Imam Ali Expressway water and gas transmission pipeline
In order to overcome Tehran’s South-North traffic problems, Tehran Municipality decided to construct Imam Ali Expressway and resolve the relevant construction site conflicts. To this end, removal of two water transmission pipelines (2,000-mm concrete pipelines) located within the limits of Khavaran Street and the gas transmission pipelines and gas supply network identified within the construction…
Zahedan feedstock pipeline and gas distribution network
Zahedan gas supply project was aimed at addressing gas scarcity in the region and constructing the infrastructures required for the development of Sistan and Baluchestan Province. The project consists of 2 parts: a feedstock pipeline and a gas distribution network. Part 1: The feedstock pipelines were constructed using 2-24 inch pipes (56 km). The pipeline…
Administrative building and gas service post
The project was constructed in an area of 1,260 m2. The floor area was 2,350 m2. The building has 2 floor and 1 underground. The concrete frame is resistant to earthquake. The building hosts Tehran Province Gas Company’s employees operating in Tehran Gas Supply District 1 and is used as a storage place for the…
Pasmangoor road access construction
Brief Description: Anarak-Pasmangoor site 21-km asphalted access road was constructed to link Pasmangoor site to Iran’s national roads network. The project consisted of a wide range of operations, including excavation, construction of technical buildings, walls, and bridges, street gutters, parapets, and installation of traffic signs. The project was aimed at developing the nuclear waste management…
Pasmangoor site fencing and leveling operations
The project was aimed at helping Iran gain nuclear independence and self-efficiency and establishing a nuclear waste management site in the city of Anarak (Isfahan Province). The project included excavation, land leveling, access road construction, fencing, and construction of entrance and exit buildings in an area of 4,000,000 m2. The project was implemented by Iran…
Water pipeline of Kermanshah Heavy Polyethylene Project
The water pipeline consisted of 8- and 16- inch pipes (15 km). The project’s client was Kermanshah Polymer Company. The project was aimed at carrying water from the Felman water wells to the raw water reservoirs belonging to Kermanshah Polymer Company. Iran Ertebat Engineering Company was the project’s contractor. Supply of all the required materials,…
Water transmission pipeline (from Alborz Dam) for Mazandaran
The project was aimed at supplying healthy and safe drinking water (1500 Liter/s) to Mazandaran Province, especially the cities of Babol, Babolsar, Amirkola, Fereydunkenar, and Kalleh Bast, and the villages located along the pipeline route. The project consists of a water treatment facility, water transmission pipelines, reservoir water transmission pipelines, and pumping stations. Alborz Dam-…
Kharg Central Administrative Building
Brief Description: The project was constructed in an area of 2,400 m2. The floor area was 3,200 m2. The building has 4 floors and a prefabricated bolted steel frame, and is used by the organization’s staff.
48-Inch Gas Transmission Pipeline
The 48-inch gas transmission pipeline construction project was aimed at ensuring and increasing sustainable supply of gas to Tehran Province, especially northern and northeastern Tehran, and Lavasanat. Tehran Province Gas Company decided to pursue the project as it could highly contribute to the Province’s development, promote residents’ welfare and well-being, help achieve a proper supply-demand…
56-Inch Gas Transmission Pipeline
The 56-inch pipeline starts from Kuh Sefid Village (Qom Province) and crosses between the boundaries of Namak Lake and Howz-e Soltan Lake running through the extremely rugged and swampy terrains before reaching Charmshahr. The 56-inch pipeline has expanded the gas transmission pipeline network operating through Tehran Province, Semnan Province and Northern Iran. The pipeline route…
Western Iran Ethylene transmission pipeline
Western Iran Polyethylene transmission pipeline was constructed to supply feedstock to petrochemical plants, develop the Iranian petrochemical industry’s infrastructures, and create jobs in Asaluyeh. The pipeline starts from East of Bushehr Province, crosses Khuzestan, Lorestan, Chaharmahal and Bakhtiari, Kohgiluyeh and Boyer-Ahmad, Kermanshah, and Kurdistan Provinces, and finally reaches Western Azarbaijan Province. Iran Ertebat Engineering Company…
Kuhdasht – Pol-e-Dokhtar Gas Transmission Pipeline
Brief Description: Iran Ertebat Engineering Company was assigned to construct a 12-inch gas transmission pipeline aimed at supplying gas to the city of Pol-e Dokhtar, developing Lorestan Province’s…
Construction of sewage collection network-Section 17
Implementing sewage network collection- section 17 of Ahar, with 22 kilometer length. Located in old part of the city of Ahar and close to the old sewage pipe laying, due to inappropriate Geologic of city, 12000 m of the way was in trench and 10000 m in hand tunneling.
Dibaj and Kalateh Rudbar Gas Supply Project
Given the region’s harsh winters, Dibaj and Kalateh Rudbar gas supply project is deemed fairly important and is aimed at promoting residents’ welfare and wellbeing. The city of Dibaj is located 55 km from Damghan in a cold region.
10- and 12- inch gas transmission pipeline, Zarand – Ravar
Zarand-Ravar gas transmission pipeline has a length of 106 km and supplies gas to the city of Ravar, the nearby villages, and different industries, especially the coal industries. The gas transmission pipeline starts from the city of Zarand and runs through the rugged mountainous terrains before reaching the city of Ravar. Demolition, explosion, and ROW…
ROW clearing and gas transmission pipeline construction
The gas transmission pipeline consisted of 12- and 20- inch pipes (78 km). The project was aimed at developing the infrastructures needed in Kermanshah Province and promoting the welfare and well-being of the region’s deprived residents. The pipeline starts from a CGS station in the city of Kamyaran and supplies gas to Ravansar, Javanrud, and…
Infrastructural operation and land preparation
Excavation and transportation operations were constructed in an area of 25 hectares. The earth was used in the operations associated with the water, wastewater, and power infrastructures, surface water drainage, roadbed preparation, and asphalting.
Maku gas transmission pipeline and TBS construction project
Transmission pipelines and branch valve, dead-end valve, and CPS facilities were used to supply gas to the cities of Maku and Showt. The transmission pipelines were branched from the 40-inch Tabriz-Bazargan gas transmission pipeline. All the operations were carried out by Iran Ertebat Engineering Company. Now, Maku and Showt residents can also benefit from natural…
Shahid Salimi Industrial Estate gas supply network
The client assigned Iran Ertebat Engineering Company to perform all the pipe laying and CPS establishment operations associated with the gas supply network. The project was aimed at launching new industries and plants and creating additional jobs in Shahid Salimi Industrial Estate.
Ali Abad Industrial Estate gas supply project
Ali Abad Industrial Estate is located at 45th km on Tehran-Garmsar Road. The gas supply network project was implemented by Iran Ertebat Engineering Company to supply the required gas to run different industries and factories in Ali Abad Industrial Estate. Ali Abad Industrial Estate gas supply network is equipped with 2-20-inch pipelines. Iran Ertebat Engineering…
Restoration and construction of bridges( Sar Bandar )
The contract included all the demolition and restoration operations associated with 16 vehicular bridges, construction of access roads associated with Sar Bandar water treatment facility’s bridges, and construction, repair and restoration of Sar Bandar water treatment facility’s decanters.
Northern Tehran Municipal District 5 gas supply project
Tehran Province Gas Company and the client assigned Iran Ertebat Engineering Company to carry out the gas transmission and feeder pipeline construction, establish steel and polyethylene pipeline networks, and install gas service lines required to supply gas to the northern Tehran Municipal District 5. This big project supplies gas to 8,000 residential and commercial units…
Isfahan-Arak 8-Inch oil transmission pipeline (feedstock pipeline)
The client intended to supply feedstock from Isfahan Oil Refinery to Arak Petrochemical Complex facilities. This project was aimed at launching new petrochemical facilities and expanding Arak petrochemical complex. In 1998, Iran Ertebat Engineering Company was assigned to carry out locating and surveying operations, supplying the required materials and implementing the transmission pipeline. The pipeline…