Description
- The construction of 20-inch pipeline with the thickness of 0.250, 0.312, 0.375 and an approximate length of 62 kilometers from launcher/receiver station (launcher output) near Behbahan city to receiver station near Gachsaran city.
- The construction of 4-inch pipeline of Ab Amiri village with an approximate length of 1400 meters from tap station to the corresponding CGS station and its installation.
- The construction of Kurdistan village branch inside tap station in 18+500 kilometers of the 30-inch available line
- The construction of the tap station related to the first branch Behbahan city, located in about 23+00 kilometers of the 30-inch available line.
- The construction of the tap station related to the second common branch of Behbahan city and Bebahan Cement according to the relevant maps.
- The construction of the tap station related to the Kheir Abad village branch according to the relevant maps.
- The construction of the tap station related to the Lishter village branch and current power plant and the construction of 4-inch pipeline of the Lishter village with an approximate length of 520 meters according to the relevant maps.
- The construction of tap station and 16-inch pipeline of Gachsaran Petrochemistry with an approximate length of 230 meters from tap station to the relevant CGS station and its installation.
- The construction of tap station and 16-inch branch related to the first branch of Gachsaran city with an approximate length of 1500 meters to the relevant CGS station and its installation.
- The construction of 20-inch receiver station and Sadat Mahale branch with the construction of a 10-inch pipeline of 2700 meters from from receiver station to the elevant CGS station and its installation.
- Completing the construction of 30-inch receiver station and 20-inch launcher station at the beginning of the 20-inch line
- Crossing 3 rivers
- Crossing 9 main roads
Scope of Work
- Preparation and supply of all special materials and goods and dedicated sopare parts for two years of the project
- Implementation of all executive operations related to the 20-inch pipelines with an approximate length of 62 kilometers
- Implementation of 22 stations and their related splits
- path construction with an approximate length of 62 kilometers
- Implementation of all land acquisition operations
- Preparing Azbilt maps
- Performing all necessary tests and experiments
- Gas injection and final connection and the delivery of gas line to the beneficiary
Key Statistics
- Soiling and path construction in a variety of earth and stone lands (2.200.000 m3)
- Series, welding and pipelining 20-inch pipelines with a length of about 61 kilometers
- Radiographic operations of 4892 spongers
- Crossing rivers and ravines (700 m long)
- Construction and completion of 11 stations
- 14 cases of crossing barriers
- Supplying the special goods of the project