عنوان | مقدار |
---|---|
Client | Tehran Wastewater Company |
Advisor | Pars Ab Tadbir Consulting Engineers Co |
Contract Period | 9 months |
Location | Tehran Municipal District 4 (Bani Hashem Street) |
Status | Finished |
Description
In recent years, the increasing urban population growth in the Metropolis of Tehran has contributed to the increased utilization of water resources and consequently a reduction in the volume and quality of the water stored at urban reservoirs and the surrounding watersheds.
This surface water management project was aimed at collecting and managing Tehran’s surface water in the Municipal District 4 (between Zeinoddin Expressway and Bani Hashem Street). The project was implemented by Iran Ertebat Engineering Company.
Since this project was carried out in one of the most congested streets of Tehran, tunneling operations were first conducted. Next, the pipes were lowered down into the tunnel and were installed. Metal supports and ties were used to secure the tunnel walls. Finally, sprayed concrete was projected onto the tunnel.
Scope of Work
- Supply of all the required materials (e.g., main pipes) as per the provided material list annexed to the contract
- Construction of the polyethylene pipeline (900-1200 mm in diameter), the subsidiary pipeline (315-500 mm in diameter), and manholes, and installation and commissioning of subsidiary facilities
Key Statistics
- Excavation in earthy and rocky terrains, approx. 200,000 m3
- Supply of different types of soil, 250,000 m3
- Pipe laying (900-1200 mm polyethylene pipes), 2,100 m
- Construction of different types of drainage (1,000 m3) and wall-laying (500 m2)
- Metalwork (rebars, metal ties, etc.) 600,000 kg
- Concreting, 10,000 m3
- Manufacturing and installation of different types of protective frames, approx. 400,000 kg
- Shotcreting the tunnel walls, 2.500 m3