Infrastructural operation and land preparation

Contract Date:

2002

عنوان مقدار
ClientNational Iranian Copper Industries Company - Sungun Copper project
AdvisorKanikavan Shargh Engineers Co
Contract Period22 months
LocationEast Azarbaijan Province, Varzaqan, Sungun copper site
StatusFinished

Description

Excavation and transportation operations were constructed in an area of 25 hectares. The earth was used in the operations associated with the water, wastewater, and power infrastructures, surface water drainage, roadbed preparation, and asphalting.

Scope of Work

  • Surveying and nailing roads
  • Water and wastewater pipelines
  • Surface water channel blocks
  • Excavation and transportation of extra excavated soil
  • Ducting, water and wastewater pipeline construction, and electrical cabling
  • Supply of all the materials required for construction of base and sub-base and street asphalting

Key Statistics

  • Site excavation 70,000 m3, 10% rocky terrain
  • Low-voltage cabling 20,000 m
  • Installing concrete curbs 12,000 m
  • Asphalt  6,500 tonnes