Kuhdasht – Pol-e-Dokhtar Gas Transmission Pipeline

Contract Date:

2004

عنوان مقدار
ClientLorestan Province Gas Company
AdvisorLorestan Province Gas Company
Contract Period14 months
LocationBetween Kuhdasht and Pol-e-Dokhtar
StatusFinished

Description

Brief Description: Iran Ertebat Engineering Company was assigned to construct a 12-inch gas transmission pipeline aimed at supplying gas to the city of Pol-e Dokhtar, developing Lorestan Province’s infrastructures, and addressing the water scarcity in the region. The pipeline has a length of 50 km. All the construction operations (ROW clearing, mechanical operations, and commissioning) were carried out by Iran Ertebat Engineering Company.

Scope of Work

  • 12-Inch pipeline construction operations, 50 km
  • Hydrostatic and coating testings and radiography operations
  • Supply of all materials as described in the contract
  • Construction of 3 LBV, branch valve, and pig- launcher and receiver stations
  • Construction of 2 CPS stations for pipeline maintenance
  • Implementation of all the required tests along the pipeline
  • Installing pipeline markers

Key Statistics

  • Excavation in earthy and rocky terrains, and explosion-prone areas, 1,000,000 m3 (mountains and plains)
  • Trenching in earthy and rocky terrains, and explosion-prone areas, 150,000 m3 (mountains and plains)
  • Supply of different types of soil, 100,000 m3
  • Radiography and insulation of 4,500 sleeves in different sizes
  • Supply and pouring of sieved soil around the pipes and adjusting the soil’s height, 150,000 m3
  • Pouring reinforced concrete around the pipes laid on the river bed (C.C.W.), 1,000 m
  • Transversing the asphalted roads, railway, and rivers, 14 points