Fereydunkenar and constructing Oujak sar-Laying water transmission pipeline from Babolsar

Contract Date:

2021

عنوان مقدار
ClientMazandaran Regional Water Company
AdvisorKhazarab Consulting Engineers Co
Contract Period16 Months
LocationMazandaran,Babolsar
StatusUnder Construction

Description

Supplying water to group-A cities of mazandaran Province including supplying potable water 1.500 lit/s, for babol,babolsar,amir kala,Fereydunkenar,kalaleh, and villages on the route. the project is intended to supply water for 603,542 population of these areas up to 2036(horizon of project).the most important tanks,and pumping stations.diameter of main steel water transmission pipeline,water storage tanks,and pumping station.diameter of main steel water transmission pipeline of this project range from 600-1200 mm from reservoir of alborz dam to fereydunkenar.

Scope of Work

Laying steel water transmission Pipeline from Babolsar Water storage tank to Fereydunkenar and water supply and return pipeline from and to Oujak sar 10000 m water storage tank

Constructing 10000-m Potable water storage tank

Constructing an Emergency pressure relief manhole at  21+400km from alborz dam

Key Statistics

Completing water Transmission Pipeline from Babolsar water storage tank to Fereydunkenar including :

Providing and installing safety relief valve (SRV) and providing building materials and Constructing a manhole at 21+400 km from alborz dam and operating the system completely.

Laying pipeline using welded steel – 900 mm, 600 mm, 500 mm, 350 mm, and 200mm.

purchasing steel pipe and providing and installing cement lining and applying hot applied coal tar enamel coating .

Crossing the pipeline under road or railroad tracks or other feature,crossing rivers,laying pipeline on steel support and /or tags.

Constructing valve chamber with overall volume of 750 m using C25 concrete Providing,transporting, and installing pipe, valves, and fittings at buildings.

Installing cathodic protection system of water transmission pipeline for two stations.

building of Oujak sar 1000 water storage tanks:

Excavation – 15000 m

Concrete from work – 1100 m

rebar steel work 430 MT

In-situ concrete pouring – 3700m

Light and heavy Structural steelworl – 500 MT

Building material for base and sub-base, and gravel and sand – 5700 m

Electrical Installations of Oujak sar 10000-m water storage tank:

Manufacturing and installation MV switchgears,cables and MV systems

Manufacturing and installation main LV power distribution switchboards,cables and LV systems .

Installation devices,equipment,Transformers,500 KVA diesel generator.

Installation electric power poles and light poles within the area of water storage tank

Installing electric power buildings

Main building including :

Excavation – 50 m

Concrete fromwork – 10000m

Rebar steel work – 77 MT

in-situ concrete pouring – 850 m

light and heavy structural steelwork – 25 MT

Purchasing and installing electrical and mechanical installation of main building .

Operation during construction of the project

Concrete enclosing wall next to road”

Building enclosing wall next to road for laying the pipeline

Manufacturing and installing steel truss bridges over Babolsar and Fereydunkenar rivers