Pasmangoor site fencing and leveling operations

Contract Date:

2009

عنوان مقدار
ClientNuclear Industry Waste Management Company of Iran
AdvisorIran Industrial Consulting Engineers Company
Contract Period5 months + 24 months (maintenance period)
LocationAnarak
StatusFinished

Description

The project was aimed at helping Iran gain nuclear independence and self-efficiency and establishing a nuclear waste management site in the city of Anarak (Isfahan Province). The project included excavation, land leveling, access road construction, fencing, and construction of entrance and exit buildings in an area of 4,000,000 m2. The project was implemented by Iran Ertebat Engineering Company.

Scope of Work

  • Excavation and reaching the code points as specified in the plans
  • Excavation, earth ramming and land leveling
  • Excavation, foundation laying, and construction of wall fences around the site
  • Installation of fences around the site
  • Construction of the entrance to the guardhouse
  • Supply of the metal materials and concrete needed to construct the fence

Key Statistics

  • Excavation in earthy and rocky terrains, and explosion-prone areas, 1,500,000 m3
  • Supply and ramming of earth 50,000 m3
  • Metal formwork, 9,000 m2
  • Supply of different metal fences, rebars, and metal materials, 350,000 kg
  • Supply and pouring of reinforced concrete, 2,000 m3
  • Construction of internal access roads, 4000 m