Shahid Salimi Industrial Estate gas supply network

Contract Date:

2001

عنوان مقدار
ClientEast Azarbaijan Industrial Estates Company
AdvisorEast Azarbaijan Province Gas Company
Contract Period 4 months
LocationShahid Salimi Industrial Estate
StatusUnder Construction

Description

The client assigned Iran Ertebat Engineering Company to perform all the pipe laying and CPS establishment operations associated with the gas supply network. The project was aimed at launching new industries and plants and creating additional jobs in Shahid Salimi Industrial Estate.

Scope of Work

  • Locating, surveying, nailing, and ROW clearing operations
  • Supplying coated pipes along with the required valves and fittings
  • Excavation and trenching operations
  • Welding and bending steel pipes, valves, and steel fittings and constructing and implementing the cathodic protection system
  • Transportation, stringing, and welding operations
  • Gas injection and commissioning

Key Statistics

  • Excavation and ROW clearing, 12,000 m
  • ROW clearing, 12,000 m
  • Trenching, 12,000 m
  • Stringing and welding, 12,000 m
  • Hydrostatic testing, 12,000 m
  • Construction and mechanical operations of TBS and CPS stations
  • Gas injection and commissioning, 12,000 m