Administrative building and gas service post
The project was constructed in an area of 1,260 m2. The floor area was 2,350 m2. The building has 2 floor and 1 underground. The concrete frame is resistant to…
Kharg Central Administrative Building
Brief Description: The project was constructed in an area of 2,400 m2. The floor area was 3,200 m2. The building has 4 floors and a prefabricated bolted steel frame, and…
Infrastructural operation and land preparation
Excavation and transportation operations were constructed in an area of 25 hectares. The earth was used in the operations associated with the water, wastewater, and power infrastructures, surface water drainage,…