Karam Abad drainage and irrigation project
This project involved the design and construction of the main and semi-main polyethylene pipelines with diameters ranging from 50 to 450 mm and equipped with irrigation laterals and wings as…
Khajeh Varzaqan Highway – Block 3 Construction
The third block (2B) of Khajeh Varzaqan 4-Lane Highway (from 760+29th to 760+37th km) with a length of 8 km is located in West Azarbaijan Province. It was aimed at…
Construction of sewage collection network-Section 17
Implementing sewage network collection- section 17 of Ahar, with 22 kilometer length. Located in old part of the city of Ahar and close to the old sewage pipe laying, due…
Infrastructural operation and land preparation
Excavation and transportation operations were constructed in an area of 25 hectares. The earth was used in the operations associated with the water, wastewater, and power infrastructures, surface water drainage,…
Shahid Salimi Industrial Estate gas supply network
The client assigned Iran Ertebat Engineering Company to perform all the pipe laying and CPS establishment operations associated with the gas supply network. The project was aimed at launching new…